DIN VDE 0100-704 Standard amendment 2018:
From 2020, the new standard must be met at the start of the construction site or if the power distribution is changed during the construction site period.
On 18 May 2021 the version of the old standard ends, i.e. until then all distributors must be replaced become.
All our site power distribution boards comply with the DIN VDE 0100-704 user standard, so you are on the safe side.
Versions
Connection distributor end distributor cabinet | PU | Item no. |
---|---|---|
A-V-E 3 44 kVA | 1 | 61833 |
Details
Security |
---|
tested according to |
Technical data |
---|
44 kVA |
Use |
---|
|
DIN VDE 0100-704 Amendment to standard 2018Are you up to date?
From 2020, the new standard must be complied with at the start of the construction site or if the power distribution is changed during the construction site period. All our construction site power distribution boards comply with the DIN VDE 0100-704 user standard, so you are on the safe side.
Section no. 704.531.3 says:
" Three-phase sockets up to and including 63A must be protected with a type B residual current device (RCD) in accordance with EN 62423."
Section no. 704.537.101 also states:
"Permanently connected building site power distributors with sockets must contain devices for disconnecting the power supply that can be locked against switching on and can be used by laypersons. A lockable enclosure is not sufficient."
The version of the old standard ends on 18 May 2021, i.e. all distributors must be replaced by then.