{"id":9235,"date":"2025-01-07T03:46:52","date_gmt":"2025-01-07T03:46:52","guid":{"rendered":"https:\/\/as2025.as-schwabe.de\/?post_type=product&#038;p=9235"},"modified":"2025-01-11T09:20:10","modified_gmt":"2025-01-11T09:20:10","slug":"v-e-1-building-power-distributor","status":"publish","type":"product","link":"https:\/\/as-schwabe.de\/eng\/product\/v-e-1-building-power-distributor\/","title":{"rendered":"V-E 1 Site power distributor"},"content":{"rendered":"<p><strong>DIN VDE 0100-704 Standard amendment 2018:<\/strong><\/p>\n<p>From 2020, the new standard must be met at the start of the construction site or if the power distribution is changed during the construction site period.<br \/> <strong>On 18 May 2021 <\/strong>the version of the old standard ends, i.e. until then <strong>all distributors must be replaced<\/strong> become.<strong> <\/strong><br \/> <strong>All our site power distribution boards comply with the DIN VDE 0100-704 user standard, so you are on the safe side.<\/strong><\/p>\n<h3>Versions<\/h3>\n<table>\n<thead>\n<tr>\n<th class=\"text-left\" scope=\"col\">Distribution end distributor cabinet<\/th>\n<th scope=\"col\">PU<\/th>\n<th class=\"text-right\" scope=\"col\">Item no.<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>V-E 1 55 kVA<\/td>\n<td class=\"text-center\">1<\/td>\n<td class=\"text-right\">61841<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Details<\/h3>\n<div class=\"table-container\">\n<table>\n<thead>\n<tr>\n<th>Security<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\n<div>\n<p>tested according to<br \/> DIN EN 61439<br \/> Compliant with DIN VDE 0100-704<\/p>\n<\/div>\n<div class=\"image-cell\"><img decoding=\"async\" src=\"https:\/\/as-schwabe.de\/wp-content\/uploads\/2024\/12\/IP44_.svg\" alt=\"[1081]\" \/><img decoding=\"async\" src=\"https:\/\/as-schwabe.de\/wp-content\/uploads\/2024\/12\/CE_schwarz.svg\" alt=\"[1085]\" \/><\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table>\n<thead>\n<tr>\n<th>Technical data<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\n<p>55 kVA<\/p>\n<div class=\"image-cell\"><img decoding=\"async\" src=\"https:\/\/as-schwabe.de\/wp-content\/uploads\/2024\/12\/Icon_Made_in_Germany.svg\" alt=\"[DE]\" \/><\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table>\n<thead>\n<tr>\n<th>Use<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\n<div class=\"image-cell\"><img decoding=\"async\" src=\"https:\/\/as-schwabe.de\/wp-content\/uploads\/2024\/12\/as-schwabe-technik-produkte-einsatzgebiet-gewerbe-icon-1.svg\" alt=\"[1]\" \/><img decoding=\"async\" src=\"https:\/\/as-schwabe.de\/wp-content\/uploads\/2024\/12\/as-schwabe-technik-produkte-einsatzgebiet-aussen-icon.svg\" alt=\"[2]\" \/><img decoding=\"async\" src=\"https:\/\/as-schwabe.de\/wp-content\/uploads\/2024\/12\/as-schwabe-technik-produkte-einsatzgebiet-innen-icon.svg\" alt=\"[3]\" \/><\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n<p><strong>DIN VDE 0100-704 Amendment to standard 2018<\/strong>Are you up to date?<\/p>\n<p>From 2020, the new standard must be complied with at the start of the construction site or if the power distribution is changed during the construction site period. All our construction site power distribution boards comply with the DIN VDE 0100-704 user standard, so you are on the safe side.<\/p>\n<p><strong>Section no. 704.531.3 <\/strong>says:<br \/> \" Three-phase sockets up to and including 63A must be protected with a type B residual current device (RCD) in accordance with EN 62423.\"<\/p>\n<p><strong>Section no. 704.537.101<\/strong> also states:<br \/> \"Permanently connected building site power distributors with sockets must contain devices for disconnecting the power supply that can be locked against switching on and can be used by laypersons. A lockable enclosure is not sufficient.\"<\/p>\n<p><strong>The version of the old standard ends on 18 May 2021, i.e. all distributors must be replaced by then.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p><strong>Distribution end distributor cabinet (V-E 1)<\/strong>  <\/p>\n<ul>\n<li><strong>Entrance<\/strong><br \/> \tM63 cable entry with strain relief up to max. 50 mm<sup>2<\/sup>\n<p> \tFuse protection Connection:<br \/> \t1\u00d7 miniature circuit breaker 3P 80A with thermal-magnetic release with frame terminals 10-50 mm<sup>2<\/sup> \t <\/li>\n<li><strong>Output<\/strong><br \/> \t1x CEE socket 400 V, 63 A, 5-pin<br \/> \t2x CEE sockets 400 V, 32 A, 5-pin<br \/> \t3x CEE sockets 400 V, 16 A, 5-pin<br \/> \t6x 230 V, 16 A socket outlets with earthing contact \t <\/li>\n<li><strong>Fuse protection outputs<\/strong><br \/> \t1x RCD 63 A, 4-pole, 300 mA, type B all-current sensitive<br \/> \t1x RCD 63 A, 4-pole, 30 mA, type B all-current sensitive<br \/> \t1x LS D 63 A, 3-pole<br \/> \t1x LS C 63 A, 3-pole<br \/> \t2x LS C 32 A, 3-pole<br \/> \t3x LS C 16 A, 3-pole<br \/> \t6x LS C 16 A, 1-pole \t <\/li>\n<li>Site power distributor in sturdy steel cabinet with heavy metal-free plastic coating in blue<\/li>\n<li>Lockable single door with spring latch bolt for padlock and recessed handle<\/li>\n<li>With side transport handles, two crane eyes at the top, strain relief rail, fastening lugs for ground pegs and earthing screw<\/li>\n<li>IP44: with door closed, IP21: with door open<\/li>\n<\/ul>","protected":false},"featured_media":4975,"template":"","meta":{"inline_featured_image":false},"genre":[],"product_cat":[68,113,369],"product_tag":[],"class_list":{"0":"post-9235","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-stromverteiler-produkte","7":"product_cat-cee-baustromverteiler","8":"product_cat-cee-baustromverteilerschraenke","10":"first","11":"instock","12":"shipping-taxable","13":"product-type-simple"},"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/as-schwabe.de\/eng\/wp-json\/wp\/v2\/product\/9235","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/as-schwabe.de\/eng\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/as-schwabe.de\/eng\/wp-json\/wp\/v2\/types\/product"}],"version-history":[{"count":0,"href":"https:\/\/as-schwabe.de\/eng\/wp-json\/wp\/v2\/product\/9235\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/as-schwabe.de\/eng\/wp-json\/wp\/v2\/media\/4975"}],"wp:attachment":[{"href":"https:\/\/as-schwabe.de\/eng\/wp-json\/wp\/v2\/media?parent=9235"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/as-schwabe.de\/eng\/wp-json\/wp\/v2\/genre?post=9235"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/as-schwabe.de\/eng\/wp-json\/wp\/v2\/product_cat?post=9235"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/as-schwabe.de\/eng\/wp-json\/wp\/v2\/product_tag?post=9235"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}